Hirsingue – Rue des Côteaux
Ref. Construction: Kerbs and setts.
CONSTITUENT MATERIALS:
– 280 ML Kerbs Type T2, Grey Robledo Flamed.
– 6900 Units cobbles Grey Robledo flamed top face, sawn the rest.
Date: 2015
Ref. Construction: Kerbs and setts. CONSTITUENT MATERIALS: – 280 ML Kerbs Type T2, Grey Robledo Flamed. – 6900 Units cobbles Grey Robledo flamed top face, sawn the rest. Date: 2015