Ref. Construction: Kerbs and setts.

CONSTITUENT MATERIALS:
–           280 ML Kerbs Type T2, Grey Robledo Flamed.

–           6900 Units cobbles Grey Robledo flamed top face, sawn the rest.

Date: 2015

Ref. Construction: Kerbs and setts. CONSTITUENT MATERIALS: –           280 ML Kerbs Type T2, Grey Robledo Flamed. –           6900 Units cobbles Grey Robledo flamed top face, sawn the rest. Date: 2015