Ref. Construction: Line number 7 mass tramway of Nantes.
Batch number 1 urban constructions between the Souillarderie and the entrance of Sainte-Luce-Sur-Loire.

CONSTITUENT MATERIALS:
8.000 ML. Grey Robledo Granite Kerb FLx15x25 cm.
6 Units roundabout Grey Robledo Granite, special piece thickness 25 and 15 cm.

Start date: January 2013
End date: June 2013
Number of lorries: 40

Ref. Construction: Line number 7 mass tramway of Nantes. Batch number 1 urban constructions between the Souillarderie and the entrance of Sainte-Luce-Sur-Loire. CONSTITUENT MATERIALS: 8.000 ML. Grey Robledo Granite Kerb FLx15x25 cm. 6 Units roundabout Grey Robledo Granite, special piece thickness 25 and 15 cm. Start date: January 2013 End date: June 2013 Number of […]