Ref. Construction: Kerbs and setts.

CONSTITUENT MATERIALS:
–           350 ML Kerbs Type T2, Grey Robledo Flamed.

–           2920 Units Cobbles Grey Robledo flamed top face, sawn the rest..

Date: 2015

Ref. Construction: Kerbs and setts. CONSTITUENT MATERIALS: –           350 ML Kerbs Type T2, Grey Robledo Flamed. –           2920 Units Cobbles Grey Robledo flamed top face, sawn the rest.. Date: 2015