Ref. Construction: Tiles and steps. Building entrance.

CONSTITUENT MATERIALS:
190 M2. Black Extremadura Flamed 1200 x ramdom x 50 mm

Start date: October  2016

End date:  November  2016

Ref. Construction: Tiles and steps. Building entrance. CONSTITUENT MATERIALS: 190 M2. Black Extremadura Flamed 1200 x ramdom x 50 mm Start date: October  2016 End date:  November  2016